Friday, July 20, 2007

Day 39, 40 & 41

!%#^en microwave.

I'll get to that in a minute. So, luckily while Andi was gone all week, absolutely nothing was done to the house. There was no adventure for the boys to have, exploring new cracks and crevasses or regaling carpenters with tales of juice boxes and McDonalds.

On Monday, the contractor from OAR called and asked if the lumber yard had been there yet? They were coming by to pick up the unused lumber and they should have been there by now. As I had two boys and a grandma ready to leave for haircuts, I really didn't care if anyone was there. He told me on Wednesday the remaining window would be delivered, and on Thursday the dumpster would be there. Most likely on Thursday someone would be there to start some demolition.

Well, just like clockwork, as I was stepping out of the house there was a flatbed truck backing up the driveway. On Wednesday, a Ryder truck stopped in front of the house and two dudes got out and rang the doorbell. They were there to deliver a window from Pella. On Thursday after the boys and I returned from play group, there was a gigantic red dumpster in our driveway (we're definitely not parking in the garage now.)

The boys and I met a new man, J.J. He was there to do demolition. He was tearing out the old exterior of the house down tot he studs. Today, J.J. and another 'guy' showed up and started more demolition. They managed to clean up the large pile of stuff that had accumulated on the side of the house and removed the rest of the exterior siding where the new door is going to go.

The following pictures I took after we moved entirely out of the kitchen along with the cabinets they tore out today.

As a little side note. As of today we have no functional kitchen. The water and all the plumbing were cut. While the fridge and stove remain, they really don't help all that much when we're washing dishes in the bath tube and drying them on the bathroom sink.





















You also might be wondering about that !#%en microwave. After I had cooked the sweet corn for about 15 minutes, it decided it was done working for the night and just blinked out. Screaming expletives I ensured that I hadn't blown a fuse. Everything else worked, coffee maker, toaster, but not this $40, P.O.S microwave. I gave it the finger and unplugged it, vowing to sacrifice it to the god Shiva later that night. After the boys went to bed, I plugged it in just to see. And with a smug little beep. It came to life.

!#%^en microwave.

Sunday, July 15, 2007

Day 32 & 33 - Our first set back

On Thursday this week, the windows were delivered. Immediately Andi suspected something with the windows, as they did not look exactly the same. It was easy to tell, as we have two large windows and two small windows. We had two small windows delivered and they looked alright. There was also one large window delivered, and that looked ok too. However, the last windows...well, I'm not sure what it looked like, but it wasn't the right size.

Well, what do we know? We're not window people, still something about them didn't look right. Any way, when I was inspecting the windows I noticed that none of them had finished woodwork. WTF? I asked Andi about it and of course the conversation went like this.

"It says in our contract that we are responsible for painting the window trim. They aren't finished."

"Why the hell would I order unfinished windows? That doesn't make any sense."

"Well, we did. Go check the contract."

"!@#% you're right. !%$^ this is going to be a lot of !#$%en work to stain these. They're freaking pine. That's a crappy wood for staining. You're going to help me. This is going to be a lot of work."

I think that we'll try to finish the staining/painting when we have to paint the walls. That way we don't have to mess around with counters and cabinets. Andi called and spoke to Kevin since the whole window thing was bothering us. As it turns out, the one odd window, was from one of our previous orders that we changed. The correct one should be delivered, Monday (tomorrow.) He also said that his partner should be there on Tuesday to start removing cabinets.

I spent the rest of the night removing the rest of the stuff from the kitchen. Here is the picture of the addition with 3 out of the 4 windows installed.

Sunday, July 8, 2007

Day 27 and Temporary Kitchen

Much to our surprise the roofers showed up Saturday morning at 7:00 am. They told us that they had a big condo job (complete tear off) that they really didn't want to start with the projected heat were going to experience that day. Our job was easy; only a few hours and they'd be done.
This weekend has been spent finishing up packing the kitchen up and relocating down the hall. We decided not to have our stove for the summer, which I think will be just fine. We bought an electric frying pan and we have skillets for the grill. I imagine that the refrigerator is going to be moved into the living room in the next few days.

Packing had been going really smoothly. I was able to easily categorize everything and all my boxes are well labeled. However, there were some areas that were tough. Having minimal moving experience (April is probably laughing at me right now :) ) there were things I couldn't categorize. Every house has it, a drawer or cupboard where random crap seems to end up. Well, we had both; a cupboard and drawer. I had been avoiding these two areas and today was forced to address them. Rather than addressing what I kept, here's some of what I threw away:

1 cell phone charger for a phone we no longer have
4 hands free ear pieces for cell phones we no longer have
appr. 1000 twist ties
couple dozen chop sticks
2 coupon books full of coupons that expired in 2005

Rather than try to sort the rest of the stuff that I deemed important (like two rolls of undeveloped film that must be from before the boys were born), I put it in a basket to address another day. That day will probably be when I decide what new drawer it's going to end up in once the kitchen is done. We had a cork board for the front of one of our cupboards that has hooks for keys. We both felt that if we loose this door to the construction we'd be screwed...those keys would always be lost. Therefore, Brian just took the door off and hung it on the wall. Perfect!
Here is our new "kitchen." I think we tripped the circuit four times this evening. I think if only one appliance is being used and no air conditioners are being used we'll be okay (oh, it's going to be a long couple of months!). Basically, we have three areas where kitchen stuff is. One is in the pantry closet in the hallway, our third bedroom which housed the treadmill and finally the living room. I packed away all my china and we are using the hutch for some food but mostly the stuff I couldn't categorize from our "junk" drawers and cupboard.


What I didn't photo document was the dozen or so boxes in the basement full of stuff I thought I could live without for a few months. I also didn't take a picture of under our bed where all the china is!

Friday, July 6, 2007

Day 26 - Preparing for the Heat Index of 100

Brian called earlier this afternoon and asked if the shingles had been delivered. I said no and we went on with our days. This involved me moving the car just in case a big truck showed up with the next load of materials. As I was walking back to the house I noticed piles of shingles on our roof along with other materials up there. I quickly called Brian to let him know that something did happen - the delivery is on top of the house.

Kevin said that the roofers will be here Monday or Tuesday and asked when we'll be out of the kitchen. Sunday night we'll be out for sure. I find it difficult to be highly motivated to work at packing because we are still using the kitchen and the addition is clearly NOT weather tight. I'll take some pictures of the "set up" that will have to work for the next month or two.

With a heat index projected to be 100 this weekend Brian is stopping to get another air conditioner. This will bring the total up to 4...one in each bedroom, one in our temporary kitchen (although I don't know how much that one will be on) and one in the living room. Hopefully the one he's borrowing today will fit in the living room. Those windows are new and don't have as large of a clearance as our older windows do.

If you leave a message on our answering machine, please indicate the time you called. We've given up resetting the time after every time we blow a fuse around here.

Thursday, July 5, 2007

Day 25

The carpenters left this afternoon and I'm guessing they aren't coming back since they took the trailer with them. We now have a roof! Far from being weather tight, you can still get a good idea of what the finished product is going to look like. It is a little disturbing how dark everything in the house is now. While disturbing, the overhang is going to be awesome for casting a shadow over the windows. Our current kitchen is VERY steamy since there is no shade. We had once tossed around the idea of doing Solar Tubes somewhere in the new space but then decided to put it off and wait to see where the dark spots were going to be. Well, I think we'll be saving like misers to eventually put in the Tubes.

Thanks for the votes on the sink...however what about WATER SPOTS? I hate, Hate , HATE cleaning the scuff marks off of my white cast iron sink, why would I want to clean water spots, daily, off of my new black sink? See, these are the things I need to know before I return the stainless steel sink we already bought.

Wednesday, July 4, 2007

It's Day 24

Our dryer situation was fixed Monday - thank the Lord given the flu bug that struck the boys Sunday and the loads of clothing and bedding that needed to be done. We also had to make a decision in regards to the length of our eves because our current kitchen walls are a foot shorter than the rest of the house (not really but it has to do with the stupid sophets in the existing space). I can't really explain it, but if you were here it would make total sense. Anyway, our overhang on the addition is going to be larger than "normal" but right in line if we were building a "green" house. How trendy...our house is environmentally friendly.

Over the weekend we devoted almost the entire day to shopping for things we need to get. For instance, a garbage disposal, new back door and storm door, dishwasher, faucet, lights, etc. I've already changed my mind about the sink. At least I think I have. Initially I declared we were getting a stainless steal sink because I hate the cast iron one we currently have. I hate how every time a pot goes in the sink I have to bleach the walls. Well, we purchased a stainless sink and now I think I might like a black cast iron sink. The reason being this is the faucet we picked out:
I can't put this on a stainless steel sink...can I?? Please readers...pontificate to your heart's desire about the pros and cons about a cast iron sink. Right now I hate mine. But, it is who knows how old and white. The new one would be new and black. Our new dishwasher is also going to be black (it's awesome...the buttons are on the top and not visible on the front. Take that little boys! No more stopping the dishwasher mid cycle or randomly starting it!) We are keeping our stove and fridge - both white and not in the budget to replace so it will have to do for right now.

Saturday, June 30, 2007

First Problems...

What remodeling project has even gone perfectly? I discovered the first major problem today. We can't dry clothing. A few weeks ago I asked Kevin if we'd loose our ability to do laundry. His exact words to me were, "I'll take your kitchen but I won't take your laundry. I'm not that mean." Well sir, you did.

You see, there is a floor joist right in our dryer vent. There is no where for the dryer to vent to. Consequently, when I tried using the dryer (because both you and the carpenter said I could) the tube blew right off the wall. I also have a sick feeling there is something wrong with our dryer but I'm remaining cautiously optimistic. So, right now I have a bunch of laundry that needs to be done and a dryer full of wet clothes. We used to have clothes line but that was eliminated the day the hole was dug.

Also, earlier this week the circuits were being played with and now one of the outlets in Ethan and Logan's room doesn't work.

 